Phased so access never closes
We work one section at a time rather than closing a floor, so every unit keeps a clear route in and out.
Common area repaints have to work around people who live there. Residents need their corridor, their stairwell, and their parkade available every single day — so the work gets phased, and the schedule gets shared before we start.
A corridor repaint in an occupied building is a logistics exercise. People need to reach their doors, move furniture, and get to the parkade — at all hours, not just when it suits the schedule. That constraint shapes everything about how the work is sequenced.
We work one section at a time rather than closing a floor, so every unit keeps a clear route in and out.
Written scopes and pricing set out so they can go straight into a council package or an AGM budget discussion.
A large repaint can be split across seasons — corridors this year, stairwells and parkade next — to fit the reserve fund.
Common area surfaces take constant contact — carts, luggage, bikes, furniture, and hands. The coatings we specify are chosen for scrubbability, not just colour.
Get a free quote

Broken out by area so the work can be split across budget years.
Get your exact pricePriced per project and broken down by area — corridors, stairwells, lobby, parkade — so a council can see each element separately and approve or defer them independently.
Planning a common area refresh for the next budget year? Get the scope priced early.
Get a free quoteBy phasing. We work one section at a time rather than closing a whole floor, so every unit always has a clear route to the elevator and the stairs. Wet areas are signed, and the corridor is left clear and usable at the end of each working day — not just at the end of the job.
Yes, and it is very common. We price by area — corridors, stairwells, lobby, parkade — so a council can approve one phase this year and defer the rest. Splitting a large repaint across two or three seasons is often what makes it work against the reserve fund.
Yes. The written scope is set out so it can go directly into a council package or an AGM discussion, with areas and pricing broken out separately. We also provide current insurance and WCB certificates, which most buildings require before a contractor starts.
We give management the phasing schedule in advance so notices can be posted through the building's usual channels, and we sign every active work area. Residents knowing which section is being done on which day removes most of the friction from a common area project.
Yes — walls, ceilings, columns, and steel components. Parkades need coatings suited to moisture and road salt, and they are usually quoted as their own phase because the setup and product specification differ from the interior common areas. Brightening a dark parkade also makes a real difference to how safe the building feels.
Both can be included, and doorframes especially are worth doing with the corridors — they are the most-touched surface on the floor and a fresh corridor beside scuffed frames looks unfinished. Unit doors need coordination with residents, so we phase those carefully and flag them separately in the quote.

The exterior window here is short and it books out fast. Here is what actually decides whether a coating will cure — and when to get your quote in.
Read the guide
If your paint is peeling, the paint is rarely the problem. Here are the three real causes and what actually prevents them.
Read the guide